Slow and steady this week, with the tiler settling in and working his way through the house. The tiled areas aren't extensive (wet areas + Laundry splashback) so we're a little surprised that we're not finished yet. But - credit where it's due - the tiler is so careful and methodical with his work that we're happy for him to take as long as he needs. Our SS called on Monday morning when the tiler turned up to make sure the tiles were all good and how we wanted them laid and blended (the colour and veining in the tile varies significantly).
The cabinetry was also replaced with Crystal Gloss, so tiling could continue. Finally.
The sinks were installed in the Bathroom and Ensuite, and the Laundry trough was done too, but is in white plastic instead of Stainless Steel. We weren't sure what to make of this (is it better or worse?), but have decided to contact our BC and ask for the stainless steel one. The heating and cooling ducts were also fitted off this week, and the holes for the rangehood were cutout - which we assume is due to the splashback guys coming through for a measure up.
The tiler also locks up the house every night, so we haven't had a chance to get any photos, but grabbed a few through the windows. If we get a chance this week, we'll post them up.
The return wall still needs to be done. Not enough tiles were supplied. Floor done. |
Finish tiling
Splashback
Garage Door
Plumbing fit off?